ID: | 10094 |
Title: | Palos Verdes Estates Pump Installed - http://bwengr.com/pump-installed/ |
Description: | We had the plan that was required to gather the vast majority of rain water onsite within PVE to circumvent the erosion on the steep cliff leading to the ocean. Currently we've been specing out pumps more frequently with the changes involved with drainage from town to city. This particular job site was something else. It turns out that the storm drain that leads directly to the water had been hooked up at the top of the street with a direct shot down to the water. |
Category: | Business |
Link Owner: | Andrea Proctor |
Date Added: | January 10, 2013 01:51:50 AM |
Number Hits: | 0 |